In winter, especially in the northern china . many places will get frozen and the temperature in the winter will be also very low, However, we also clearly know that the concrete mixing plant should make the normal production in the winter. During the use of concrete mixing plant in the cold winter, there are some components that need to be maintained and some matters needing attention.followings are some matters needing attention for the water supply system of concrete mixing plant in winter.
1. Before the operation of concrete mixing plant, it is necessary to check whether the water pump of water supply system is normal or not. After confirming that it is normal, users can begin the production of concrete mixing plant.
2. In the cold winter, in order to prevent the water from getting frozen to affect the normal production, users can add some antifreeze into the water, which can ensure the normal production of concrete mixing plant.
3. Regularly check the electric motor of the water pump of water supply system whether the rotating direction is normal or not. If it is wrong, change the wiring of electric motor. Then fill the water pump with water in order to ensure the normal water supply of concrete mixing plant.
4. Ensure the water volume of water supply system. It is prohibited to cause empty barrel. Besides, measure the water accuracy, which can guarantee the normal production of concrete mixing plant.